Skip links

Construction Begins on Phase I of AI Northside Industrial Park

Nampa, ID (July 30, 2020) – IBC Industrial, LLC, a Boise-based industrial real estate development firm, breaks ground on a new industrial park.

The first phase of AI Northside Industrial Park will include two best-in-class industrial buildings, totaling 280,000 sq. ft. A 32-foot ceiling clearance, ESFR sprinkler system and 200+ foot-wide truck court are a few of the many features that make this an efficient and productive environment for businesses with warehouse distribution requirements.

The AI Northside Industrial Park, located just one mile north of the I-84 interchange at Northside Blvd., boasts a prime location benefiting from the robust business environment of Nampa. Divisible to 28,000 sq. ft. and constructed with attention to details large and small, including: dock high dock doors with padding and load levelers, LED motion-sensored lighting, skylights, Cambridge ventilation systems and slab armor, AI Industrial Park will be an ideal location for a wide array of businesses to call home.

Inquiries regarding additional building specifications or space availabilities, contact Brad Miller or Mike IBC at 208-506-7170 or at adler-industrial.com. IBC Industrial is located at 10259 W Emerald Street, Ste. 100, Boise, Idaho 83704.

Tags: